Construction workers with hard hats on active building site with cranes and steel structuresAerial view of large construction site with cranes and concrete structures in progressConstruction engineers with hard hats reviewing building plans on siteHappy project team celebrating successful construction milestoneConstruction team surveying completed building structure with satisfaction
Programming the Built World — 25+ Years Experience

We verify decisions
before construction.

Digital twins for decisions that matter
— automated & verifiable planning.

We verify decisions before construction — so the construction site only executes what already works. Model-based project control for building owners, general contractors, and general planners. Over €1 billion supervised project volume.

BIM Coordination & Clash Detection25+ Years Experience€1B+ Supervised Project VolumeReferences: Major projects for Hilti, Siemens and others

When we're brought in

Project is being prepared

Requirements and expectations are still unclear.

There is no reliable foundation for decisions.

Project starts

Participants are working — but without a shared data foundation.

No one knows if the current state will meet the next deadline.

Planning is underway

Everyone is delivering — but no one can assess if deadlines will hold.

Commitments become uncertain. Deviations remain invisible.

We ensure early on that deviations become visible before they have consequences.

What you actually get

  • Know early whether your deadline is realistic
  • Early warning before critical deliveries
  • Visible responsibilities instead of endless coordination
  • Transparency about the actual project state
  • Forecast instead of surprise
  • A project that works calmly — through a clear data foundation

How we work in the project

Beginning

We clarify expectations and establish shared working rules.

Assessment

Early phase

We make visible whether deliverables will meet the next deadline.

Assessment

Ongoing

We identify deviations early and resolve them without escalation.

Assessment

Once the project is set up correctly, we can measure as often as needed — without additional effort for participants.

The Problem

In construction, insight comes
too late.

Imagine a car manufacturer launching a new model without a crash test. Unthinkable? In construction, this is reality. Planning is not verified — the construction site is the crash test. And every crash costs

5-10x more than prevention.

01

Planning based on assumptions

Sub-models are created in isolation. Coordination happens on paper. Nobody knows if the plan actually works — until it's too late.

02

Construction site resolves conflicts

HVAC ducts hit beams. Pipes collide with cable trays. Problems that should have been solved in planning are discovered during construction.

03

Costs from surprises

Rework, delays, idle subcontractors. Every surprise on site becomes a cost explosion — especially in projects worth €30M and above.

Projects become expensive
when reality becomes the testing environment.

The difference

What changes in projects.

Before

Coordination

Daily meetings, emails, follow-ups. Coordination as a permanent state.

Interpretation

Every stakeholder works with their own understanding of the plan. Deviations are noticed late.

Surprises

Conflicts surface on site. Rework, delays, cost overruns.

After

Decisions

Clear, data-based foundations. Less discussion, more action.

Verifiable states

One shared, coordinated model. Everyone works with the same reality.

Predictability

Risks are identified and assigned. The site executes instead of improvising.

The Solution

Model-based
Project Control.

Happy project team celebrating successful construction milestone

We accompany projects — and make planning provable.

Detect early

Reports.

Steer together

Meetings.

The result

Verifiable states.

The Root Cause

When a process only works because people constantly align, call, clarify and double-check — the issue is usually not complexity.

It is under-specification.

Well-designed systems don't rely on permanent coordination. They reduce the need for it.

Scalable processes are built on explicit decisions, clear ownership, and shared rules that work even when no one is in the room.

For Whom

Three perspectives.
One shared reality.

Building owner surveying completed construction project
Building Owners & Clients

Control

  • Know if planning works

    Not assumptions — verifiable states. Backed by years of experience in large-scale projects.

  • Identify risks early

    Before they become expensive problems on site.

  • Provable decisions

    Every decision backed by data, not opinions.

General contractor coordinating construction workers on active building site
General Contractors

Coordination

  • Same reality for all planners

    One coordinated model instead of isolated sub-models.

  • Less coordination overhead

    Fewer meetings, fewer emails, fewer misunderstandings.

  • Fewer problems on site

    Clashes resolved in the model, not on the scaffold.

Engineers reviewing building plans and models together
General Planners

Integration

  • One truth across all sub-models

    Coordinate all Teilmodelle into a consistent overall model — verifiably.

  • Clear interfaces between disciplines

    Define responsibilities and handover points systematically.

  • Verifiable planning quality

    Rule-based checks and AI-assisted quality assurance instead of manual review.

Our Services

BIM Management
& Coordination

Model-based project control for building owners, general contractors, and general planners — from planning coordination to construction certainty. Proven in projects from €30M to over €150M.

Construction engineers with hard hats reviewing building plans on site — BIM management in action

BIM Coordination

Merging sub-models (Teilmodelle), defining interfaces, creating one coordinated overall model.

Clash Detection & Collision Checking

Systematic identification and documentation of all conflicts before construction starts.

Model-based Quality Assurance

Rule-based checks, completeness verification, and model validation — increasingly AI-supported.

BIM Controlling & Reporting

Data-driven project management with traceable, verifiable decision-making foundations. Reports as a tool, not the goal.

Planning Alignment

Aligning all stakeholders to one shared planning reality — before construction begins.

Process & Interface Management

Defining workflows, securing handover points, clarifying responsibilities.

The Result

Construction executes
instead of improvising.

Construction certainty through verified planning — less rework, fewer delays, lower costs.

Perspective

Other industries have already
taken this step.

The construction industry is the last major industry that doesn't make decisions digitally. Yet other industries have shown how it's done for decades.

Automotive Industry

No car is built without being digitally tested first. Crash tests, aerodynamics, stress — all simulated before the first sheet of metal is pressed. Virtual Prototyping is standard.

For 30+ years

Software Development

No code goes live without automated tests. CI/CD, unit tests, integration tests — every change is verified before it goes to production.

For 20+ years

Aviation

No aircraft takes off without verified systems. Every component, every interface, every process is digitally validated before the first flight.

For 40+ years
The Exception

Construction Industry

Billion-euro projects. Hundreds of participants. Thousands of interfaces.
And the construction site is still the testing ground.

Yes, we produce reports too — but reports are a means to an end. The goal is verifiable states, not documents.

We're changing that — with model-based project control, Virtual Prototyping, and AI-supported verification.

The Path

From Alignment
to Industrialization.

It starts simple: model-based work and alignment. We accompany all project participants — step by step. Those who want to, go further.

Construction engineers with hard hats reviewing building plans together on site
Aerial view of large construction site with cranes and concrete structures in progress
Step 1 — Available

Align

BIM Controlling & Planning Coordination

Define minimal requirements for model-based work. We accompany all participants of your project — from a shared planning reality to construction certainty before groundbreaking.

Available now

Automate

Rule-based & AI-supported Verification

We're right in the middle of this — and developing further every day. Automated checks, standardized workflows, AI-driven quality assurance. The speed of progress is enormous.

Available now
Step 2 — Available
Step 3 — Vision

Industrialize

Reality Programming

When model and reality match, prefabrication becomes possible. Components are manufactured in factories — millimeter-precise, quality-assured, on schedule. The IKEA principle at large scale: every part fits, because it was digitally verified.

Long-term vision

You don't have to take the whole journey. Simply start with Alignment— we'll guide you. Everything else follows naturally.

Why This Matters

When decisions become verifiable:

Coordination becomes repeatable

Planning becomes calculable

Construction becomes controllable

This is the beginning of:

Reality Programming

Minimize risk — for time, cost and quality.

Less rework, fewer surprises — because it's verified.

The result:

First understand. Then build with certainty.

The physical world follows
the verified digital decision.

The first step

Let's talk about your project.

In a first conversation, we clarify whether a reliable state assessment is possible for your project — and what the process would look like.

  • Project size and key deadlines
  • Current challenges and expectations
  • Afterward: An honest assessment of whether and how we can help

No sales pitch. No obligation. Just clarity.